Search results for: 'Hero7'
Usually dispatched in 25-30 days.
- Up to 48 lb
- 7 Step Pan/Tilt Drag
- Quick release brakes
- Illuminated Bubble
Usually dispatched in 25-30 days.
- Cameras up to 48lb
- 7+0 Step Drag
- flowtech 100 Tripod
- Ground Spreader
Usually dispatched in 25-30 days.
- Payload 22kg
- Carbon Fiber
- 16x counterbalance
- Sliding Range 150mm
Usually dispatched in 25-30 days.
Sachtler System 20 S1 HD MCF tripod kit with mid-level spreader & bag
€13,685.00 €10,948.00 €9,200.00
Usually dispatched in 25-30 days.
Sachtler System 20 S1 SL HD MCF tripod kit with mid-level spreader & bag
€14,161.00 €11,328.80 €9,520.00
Usually dispatched in 25-30 days.
Usually dispatched in 25-30 days.
Sachtler System 30 EFP 2 MCF tripod kit with mid-level spreader & rubber feet
€15,749.65 €12,599.72 €10,588.00
Usually dispatched in 25-30 days.
Usually dispatched in 10-15 days.
Usually dispatched in 25-30 days.
Usually dispatched in 25-30 days.
- Cameras up to 22kg
- Touch&Go Plate
- 7+0 Step Drag
- Ground spreader
Usually dispatched in 25-30 days.
- For Cine 7+7 HD
- Weight 180g
- Width 59mm
- Length 210mm
Available immediately, Usually dispatched in 1-3 days.
- Payload 4,0 kg
- 75mm Halfbowl
- Max. Height 1,69 m
- Min. Height 0,78 m
Available immediately, Usually dispatched in 1-3 days.
- Payload 4,0 kg
- 75mm Halfbowl
- Max. Height 1,73 m
- Min. Height 0,57 m
Usually dispatched in 10-15 days.
- Camera Bag
- 34x18x22.5cm (int.)
- 40x22x26cm (ext.)
- 1.9 kg (4.2 lbs)
Usually dispatched in 5-10 days.
- Padded Bag
- for flowtech tripods
- with FSB fluidheads
- aktiv10,10T, 12T,14T
Usually dispatched in 5-10 days.
- Padded Bag
- Heads Video15/18/20
- on tripods 100 long
- ENG 2 HD, EFP 2
Usually dispatched in 5-10 days.
Usually dispatched in 5-10 days.
Usually dispatched in 25-30 days.
- Up to 48 lb
- 7 Step Pan/Tilt Drag
- Quick release brakes
- Illuminated Bubble
Usually dispatched in 5-10 days.
- Payload up to 16kg
- 100 mm
- SpeedSwap
- Middle Spreader
Usually dispatched in 25-30 days.
- Payload up to 12kg
- 100 mm
- SpeedSwap
- Ground Spreader
Usually dispatched in 25-30 days.
- Payload up to 12kg
- 100 mm
- SpeedSwap
- Middle Spreader
Usually dispatched in 25-30 days.
- Payload up to 14kg
- 100 mm
- SpeedSwap
- Ground Spreader