Tripods and more
Usually dispatched in 25-30 days.
- Payload 22kg
- Carbon Fiber
- 16x counterbalance
- Sliding Range 150mm
Usually dispatched in 25-30 days.
- Payload 22kg
- Touch&Go Plate
- 16x counterbalance
- Dolly S
Usually dispatched in 25-30 days.
- Payload 22kg
- Touch&Go Plate
- 16x counterbalance
- SpeedLevel Clamp
Usually dispatched in 5-10 days.
- Lightw. fluid head
- Payload 20kg
- Quick Release plate
- Pan handle
Usually dispatched in 25-30 days.
- Payload 15-44lb
- Perfect balance
- TF drag technology
- Quick release brakes
Usually dispatched in 25-30 days.
- Payload 14.3-37.5lb
- Side load system
- LF drag technology
- Quick release brakes
Usually dispatched in 25-30 days.
- Payload 12.1-30.8lbs
- Side load system
- LF drag technology
- Quick release brakes
Usually dispatched in 25-30 days.
- Cameras up to 48lb
- 7+0 Step Drag
- flowtech 100 Tripod
- Ground Spreader
Usually dispatched in 25-30 days.
- Cameras up to 22kg
- Touch&Go Plate
- 7+0 Step Drag
- Ground spreader
Usually dispatched in 25-30 days.
- Up to 37.5 lb
- Side load system
- LF drag technology
- Carbon fibre legs
Usually dispatched in 25-30 days.
- Carbon fibre
- Mid-level spreader
- Up to 30.8 lb
- Quick release brakes
Usually dispatched in 25-30 days.
- Up to 48 lb
- 7 Step Pan/Tilt Drag
- Quick release brakes
- Illuminated Bubble
Usually dispatched in 25-30 days.
- Up to 48 lb
- 7 Step Pan/Tilt Drag
- Quick release brakes
- Illuminated Bubble
Usually dispatched in 25-30 days.
Sachtler System 20 S1 SL HD MCF tripod kit with mid-level spreader & bag
€14,161.00 €11,328.80 €9,520.00
Usually dispatched in 25-30 days.
Usually dispatched in 25-30 days.
Sachtler System 30 EFP 2 MCF tripod kit with mid-level spreader & rubber feet
€15,749.65 €12,599.72 €10,588.00
Usually dispatched in 25-30 days.
Usually dispatched in 25-30 days.
Usually dispatched in 25-30 days.
Usually dispatched in 25-30 days.
Sachtler System 20 S1 HD MCF tripod kit with mid-level spreader & bag
€13,685.00 €10,948.00 €9,200.00
Usually dispatched in 25-30 days.
Usually dispatched in 5-10 days.
- 6,5 - 17 kg Payload
- 100mm Half Bowl
- Sideload Plate
- LF-Drag
Usually dispatched in 5-10 days.
- 5,5 - 14 kg Payload
- 100mm Half Bowl
- Sideload Plate
- LF-Drag
Usually dispatched in 15-20 days.